新浪微博
腾讯微博
微信
QQ空间
QQ好友
手机阅读分享话题

Chongqing News

All walks of life work hard on the first working day after the eight-day holiday

2023-10-09 10:59:38

加油干

In Jiangbei Shimahe Sub-district, the urban management grid member and community staff were checking for leaks in residents' air conditioners on October 7. (Photographed by Cui Li / Visual Chongqing)

加油干2

The workers of Chongqing Midea General Refrigeration Equipment were assembling air conditioners at the production line in Nan’an District on October 7. (Photographed by Xie Zhiqiang / Visual Chongqing)

加油干3

The workers of CCCC First Highway Engineering Group were building keels made of T-section beams at the T-section beam prefabrication site of the second Chongqing-Wuhan High-speed Railway in Beibei District on October 7.

The second Chongqing-Wuhan High-speed Railway is one of the significant ‘rays’ of the Chongqing high-speed railway network consisting of three loop lines, twelve rays, and seven interconnected lines. With a length of 35.53 kilometers and a design speed of 100 kilometers per hour, the railway has six lanes in two directions. It is scheduled to be completed and open to traffic in 2024. (Photographed by Wan Nang / Visual Chongqing) 

(Translated by Yuki, Fathom Language Limited)

Editor:Jiang Yiwei